Avera Completes Construction at Park 8

Avera has completed construction at Park 8, a 242,760 SF distribution facility at the southwest corner of Beltway 8 and I‑45 North in northwest Houston. Park 8 is situated on 17.2 acres, with another ±5.67 acres available for additional parking or outside storage.

Park 8 is strategically located within close proximity to Bush Intercontinental Airport, and sits adjacent to Pinto Business Park. Avera Construction is exempt from COVID-19 related operational restrictions, and the building was delivered on schedule.

Park 8 features a 32’ clear height, 50′ x 52’ column spacing, and a cross dock configuration with dock-high loading. The facility includes 130’ truck courts, oversized ramp doors, ample trailer storage, and an ESFR sprinkler system. The perimeter is fully fenced. The office will be built to suit tenant.

For information regarding leasing, please contact Jason Dillee or Nathan Wynne with CBRE.